What to Do When Your New Appliance Arrives: A Step-by-Step Setup Guide
Your new appliance has just been delivered. Now what? Here's a step-by-step guide to setting up your fridge, washing machine, dishwasher or oven correctly from day one — to ensure it performs well and lasts as long as possible.
Setting Up a New Fridge
Step 1: Position and Level
Place the fridge in its designated spot with at least 5cm clearance on each side and at the back for ventilation. Use the adjustable feet to level the fridge side-to-side and tilt it very slightly backwards so the door swings shut on its own.
Step 2: Wait Before Turning On
If the fridge was transported on its side or at an angle, wait at least 2 hours before plugging it in. This allows the compressor oil to settle back in place. If it was delivered upright, waiting 30 minutes is sufficient.
Step 3: Turn On and Let It Cool
Set the temperature (typically 3–4°C for the fridge, −18°C for the freezer) and allow 24 hours for the fridge to reach temperature before loading it with food. Don't pack it completely at first — let it stabilise.
Step 4: Clean the Interior
Wipe down the interior with a damp cloth and mild soap before loading with food. Rinse with clean water and dry.
Setting Up a New Washing Machine
Step 1: Remove Transit Bolts
Front-loading washing machines are fitted with transit bolts (usually 3–4 large bolts at the back) that lock the drum during transport. These MUST be removed before the first wash. If you leave them in, the machine will make a violent banging noise and could be damaged. Check your manual for the location.
Step 2: Connect Water and Drainage
Connect the inlet hose (blue = cold, red = hot on some models) and ensure the drain hose is correctly positioned in the standpipe or laundry tub. Turn on the tap and check for leaks.
Step 3: Level the Machine
Adjust the feet so the machine is level and doesn't rock. An unlevel machine will vibrate excessively and wear out faster.
Step 4: Run an Empty Cycle
Run a short empty wash cycle (60°C if possible) to flush out any manufacturing residue before washing your first load of clothes.
Setting Up a New Dishwasher
Step 1: Connect Water and Drainage
Ensure the water inlet and drain hose are correctly connected. The drain hose should loop up high under the bench before connecting to prevent backflow.
Step 2: Fill the Salt Reservoir
Most dishwashers have a salt reservoir for the water softener system. Fill with dishwasher salt (not table salt) before the first use. This is especially important in Sydney where water hardness varies.
Step 3: Fill the Rinse Aid Dispenser
Top up the rinse aid dispenser. This helps dishes dry streak-free and prevents water spots on glassware.
Step 4: Run a Test Cycle
Run the dishwasher empty on a short cycle to check everything is connected correctly and working.
Setting Up a New Oven
Step 1: Initial Burn-In
New ovens often have a protective coating on the interior that can release a slight smell on first use. Set the oven to 200–220°C and run it empty for 30–45 minutes with good ventilation. This burns off the coating and is completely normal.
Step 2: Check the Seal
Ensure the door seal is properly seated around the door opening. A good seal is essential for efficient cooking.
Step 3: Calibrate if Needed
Some ovens run slightly hotter or cooler than their dial setting. Use an oven thermometer to check and adjust your cooking temperatures accordingly.
Oceania Appliances: We Handle the Delivery and Positioning
When we deliver your appliance, our team carries it into position in your home. If you have any setup questions, our team is happy to assist. Call us at 0493 142 999.
Showroom: 2/14 Centre Place, Wetherill Park — open 7 days, 10am to 8pm